I. Processing Processes and Technical Key Points
Hohenhameln
1. Design and Material Selection
Hohenhameln Modular Design: Use standardized containers (such as 20/40 feet) as basic units, and optimize the space layout with the help of BIM technology to ensure the flexibility of splicing and the stability of the structure.
Hohenhameln Material Selection: The main body adopts a weathering steel (such as Corten steel) or galvanized steel frame. Lightweight composite materials (such as aluminum honeycomb panels + rock wool insulation layer) are used for the internal and external walls, which have both strength and thermal insulation performance.
Hohenhameln
Hohenhameln Compliance: The design needs to comply with international container construction codes (such as ISO 668) and the building safety standards of the target area (such as wind resistance and seismic grade).
Hohenhameln 2. Main Body Processing
Structural Transformation: Cut the side panels of the container to form door and window openings, and laser cutting ensures precision; install H-shaped steel or square tube skeletons inside to enhance the load-bearing capacity (for example, additional support is required for the second floor structure).
Hohenhameln
Surface Treatment: After sandblasting to remove rust, coat with an epoxy primer + polyurethane topcoat, or use externally hung anodized aluminum plates to improve corrosion resistance.
Hohenhameln Thermal and Sound Insulation: Fill with a polyurethane foam layer (thickness ≥ 80mm), combined with double-layer insulating Low-E glass to achieve high energy efficiency with a U-value ≤ 0.3 W/m²K.
Hohenhameln
3. Pre-installation of Functional Systems
Hohenhameln
Hohenhameln Pre-embedding of Water and Electricity Pipelines: Integrate PPR pipes and flame-retardant cables, pre-install an intelligent control system (such as the KNX bus), and reserve photovoltaic interfaces to support off-grid power supply.
Equipment Integration: Embed a split-type air conditioner and a fresh air system (PM2.5 filtration efficiency ≥ 95%). The kitchen and bathroom adopt overall modular installation (such as one-piece forming of 304 stainless steel).
Hohenhameln 4. Interior Fine Decoration
Hohenhameln
Hohenhameln Environmentally Friendly Materials: Select formaldehyde-free panels (such as OSB board + water-based paint), and lay SPC snap-lock flooring on the ground (waterproof and moisture-proof).
Hohenhameln
Smart Home: Pre-install embedded IoT devices (such as voice control panels, electric curtain rails), and support 5G/Wi-Fi 6 access.
Hohenhameln
II. Installation Processes and Technical Specifications
1. Site Preparation
Hohenhameln
Hohenhameln Foundation Treatment: Select the foundation form according to the geological report - use pile foundations (such as micro steel pipe piles) in soft soil areas, and for hard foundations, a concrete raft foundation (thickness ≥ 200mm) or a steel structure ground beam can be used.
Hohenhameln
Pre-connection of Water and Electricity: Pre-embed water supply and drainage pipes and cable trenches, and install a septic tank or connect to the municipal pipeline network (it needs to meet local environmental protection requirements).
Hohenhameln
Hohenhameln 2. Hoisting and Fixing
Module Transportation: Use a low-bed flatbed truck for transportation, and control the weight of a single container within 25 tons (standard for a 40-foot HQ container).
Hohenhameln Precise Positioning: Use a total station to calibrate the level. Connect the modules with high-strength bolts (such as grade 10.9) or welding, with an error ≤ 3mm.
Wind-resistant Anchoring: The diameter of the anchor bolts ≥ M20, and the depth ≥ 500mm. In typhoon areas, additional diagonal steel cables (such as Φ12mm steel wire ropes) need to be added.
Hohenhameln
Hohenhameln 3. System Joint Debugging
Hohenhameln
Hohenhameln Pipeline Connection: Connect the water and electricity pipelines with quick connectors, and conduct a pressure test (maintain a pressure of 0.6MPa for the water supply for 30 minutes without leakage).
Hohenhameln
Hohenhameln Energy System: Optimize the inclination angle of the photovoltaic panels according to the local latitude, and configure the capacity of the energy storage battery pack (such as LiFePO4) at 1.5 times the daily power consumption.
Hohenhameln
4. Acceptance and Debugging
Hohenhameln
Hohenhameln Structural Safety: A third-party testing agency issues a load report (such as the live load on the top ≥ 150kg/m²).
Environmental Protection Certificate: Ensure that the formaldehyde emission of the materials ≤ 0.03mg/m³ (EN 717-1 standard), and the noise level ≤ 40dB (A).
Hohenhameln
III. Innovation and Cost Optimization Suggestions
Hohenhameln
Rapid Disassembly and Assembly Technology: Develop patented connection nodes (such as mortise and tenon-style buckles) to shorten the on-site installation time to within 3 days.
Circular Economy: Transform second-hand containers (cost reduced by 30%), and match them with a detachable interior installation system for easy secondary use.
BIPV Technology: Integrate thin-film solar panels (such as CIGS) as exterior wall materials to achieve a zero-energy consumption building.
Hohenhameln IV. Regulations and Market Adaptation
Hohenhameln
Hohenhameln Approval Process: In some regions, container buildings are classified as temporary facilities (no building planning permit is required), but they need to meet fire protection (such as GB50016) and electrical safety codes.
Hohenhameln
Hohenhameln Application Scenarios: Focus on promoting it in fields such as cultural and tourism homestays (such as in mountainous areas and coastal areas), emergency housing (delivered within 72 hours), and mobile commercial spaces (coffee shops, exhibition halls), etc.
Hohenhameln
Hohenhameln
Hohenhameln
Hohenhameln Through standardized production and intelligent management, the space capsule container house can significantly reduce the comprehensive cost (about ¥2000-4000 yuan/m²), and become an important solution for sustainable buildings. In actual projects, customized design is required in combination with the local climate (such as adding underfloor heating in extremely cold regions) and cultural aesthetics.
Hohenhameln
发表评论